front-end loader operator

Title:  front-end loader operator
Address:  Dickinson/Texas/United States
Posted on:  May 29, 2013
Experience:  8
Education: 
Bio Brief: 
Description: 

Pete Heffley Email:[email protected]
5403 Honeyvine Dr. Phone: (281)857-6237
Dickinson Texas 77539 Mobile: (713) 418-0902

SUMMARY OF QUALIFICATIONS:
10 years of highway construction experince. Attended UTI in Houston Texas with main focus on Automotive Technology. Presently working in the automotive field.

CAREER HISTORY:

Auto Technician
Sears
Baytown Texas January 2005 to Present
 Battery changes and diagnosing Oil changes on various autos Tire mounting and balancing replacing alternators and starters.

UTI
Houston Texas
 Studies in Automotive Technology Graduated October 28, 2005

Heavy Highway Construction
Archie Maxfield Construction
Amarillo, Texas November 2003 to May 2004
 Operated front-end loader and crusher.
 Routine maintenance to equipment.

Quality Control
United Metro Materials
Phoenix, Arizona August 2001 to October 2003
 Monitored concrete mixtures to ensure correct mix specifications, arranged corrective actions when necessary to guarantee customer satisfaction and return business.
 Participated in field inspection and coordination of concrete cylinder sampling. Logged all materials to comply with ACI testing procedures.
 Oversaw aggregate composition from concrete plant to assure proper mixtures and accurate client specifications.
 Ran cold feeds on asphalt to assure material handling was within specification tolerances and adjusted as necessary to meet field conditions.
 Attended all staff and safety meetings. Was awarded safety certificates on 2 separate occasions.

Quality Control
Rea Construction
Charlotte, North Carolina January 2000 to August 2001
 Certified North & South Carolina DOT Asphalt Inspector
 Performed density testing on various State and City Projects.
 Ran gradations, analyzed and produced various control tests to confirm mixes with preset specifications.
 Adjusted roller patterns insuring proper density and reporting all data to Rea and State Inspectors.
 Conducted quality assurance sample testing on both freshly batched concrete and site delivered product.
 Sampled and monitored concrete core cylinders to insure proper breaking dates along with cataloging test results and PSI analysis.
 Oversaw timely dispatch and proper delivery of concrete materials to various construction sites in both North and South Carolina while managing all field and quality inquiries.

Page 1 of 2
Pete Heffley Email:[email protected]
5403 Honeyvine Dr. Phone: (281)857-6237
Dickinson Texas 77539 Mobile: (713) 418-0902
Page 2 of 2

Assistant Project Manager / Materials Tester / Sr. Field Technician
Geoscience Group, Inc.
Charlotte, North Carolina September 1998 to December 1999
 Read and interpreted engineering plans to locate structural components.
 Completed concrete testing and verification for 7-story parking ramp addition to Uptown Charlotte.
 Prepared all concrete sampling documentation and conducted break tests on samples at 1, 3, 7 and 28 days.
 Inspected all steel and post tension cable stressing locations on various projects. Noted all defects and coordinated field meetings for corrective actions.
 Conducted field-boring layouts.
 Drafted project status reports for various clients.
 Prepared density and concrete testing procedures.
 Inspected structural steel and reinforcing bar placement.