SEMINOLE COUNTY TRAIL OVERPASS & GEE CREEK BRIDGE 2012

Location: ,FL,UNITED STATES
Project Type: New Construction
ProjectUse: Fencing
Project Budget: 500,000 to 1,000,000 USD
Contact Method : With Contact Details
Name : Jacqui V Perry , 1101 E 1ST ST , SANFORD , FL , 32771-1468 , Ph: 407 665-7122

Posted on :May 26, 2012
Last Updated :May 26, 2012
Bid Date: 11/06/2012

Description:

Bridge[s] & Culvert[s],Park[s], Landscaping,Fencing

REPAIR CROSS SEMINOLE TRAIL (CST) I-4 OVERPASS & GEE CREEK BRIDGE

Labor, materials, equipment, transportation, coordination, and incidentals necessary to construct the repair of the CST I-4 Overpass & Gee Creek Bridge with emphasis on highly aesthetic quality finished product. CST I-4 Overpass including but not limited to Drainage Flume (F&I) (Per Anchorage), Slab And Soil Removal (Per Anchorage), Poured Joint With Backer Rod (F&I) (2 Anchorages), Waterproof Membrane (F&I) (Per Anchorage), Slab Concrete (F&I) (2 Anchorages), Slab Reinforcing (F&I) (2 Anchorages), and Cleaning and Coating Concrete Surfaces Class 5, overpass repair with emphasis on highly aesthetic quality finished product. CST Gee Creek Bridge including but not limited to site preparation Replace Existing Concrete (6”) Approach Slabs (2), Replace Existing Damaged Stringer (4 x 16), Replace Existing Backwall Timbers (6 x 6), and Connections To Handrail, bridge repair with emphasis on highly aesthetic quality finished product.