CTSI FINISHED WATER RESERVOIR PHASE 1

Location: ,OR,UNITED STATES
Project Type: New Construction
ProjectUse: Electrical Work
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : Delores Pigsley , PO BOX 549 , SILETZ , OR , 97380 , Ph: 541 444-2532

Posted on :May 26, 2012
Last Updated :May 26, 2012
Bid Date: 14/06/2012

Description:

Water Treatment,Water Piping,Electrical Work,Fencing,Sewage Piping,Sewage Treatment

The project consists of the following major items of construction: 1. New glass fused to steel 0.5 million gallon (MG) finished water reservoir, associated tank appurtenances, earthwork, on-site piping and valves, fencing, electrical, access road, and other miscellaneous work. 2. New booster pump station building which will include two (2) new booster pumps, piping, valves, electrical and telemetry, as well as other miscellaneous work. Space in the new building will be provided for future installation of fire pumps, storage/lab/rest room, chlorination and fluoride feed systems. 3. New level sensor and radio telemetry system at the existing finished water reservoir; new radio telemetry system at the existing booster pump station; new level sensor at the new finished water reservoir and new telemetry system at new booster pump station. 4. Installation of approximately 200 lineal feet of new 10-inch diameter and 1,054 lineal feet of 8-inch diameter water line via conventional trench installation and 300 lineal feet of 8-inch diameter water line via horizontal directional drilling along with associated appurtenances and other miscellaneous work.