CLACKAMAS CO VARIOUS STREET

Location: ,OR,UNITED STATES
Project Type: New Construction
ProjectUse: Roads
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : Lane Miller , 9101 SE SUNNYBROOK BLVD , CLACKAMAS , OR , 97015-6612 , Ph: 503 353-4348

Posted on :May 26, 2012
Last Updated :May 26, 2012
Bid Date: 12/06/2012

Description:

Road[s]

THIESSEN ROAD, JENNIFER STREET, 135TH AVENUE, EVELYN STREET, AND MANGAN DRIVE PRESERVATION PROJECT

Resurface the 5 sites listed above with two layers of asphalt, except the 135th
Avenue site which will be one 2” layer of asphalt. All sites will require limited cold plane asphalt removal. This
project will utilize approximately 22,250 tons of asphaltic concrete. Construction is to be completed by
September 30, 2012. The engineer’s estimate is approximately $2,000,000.