LOUISIANA VISUALLY IMPAIRED SCHOOL AIR HANDLING UNIT

Location: ,LA,UNITED STATES
Project Type: New Construction
ProjectUse: Special Schools
Project Budget: 500,000 to 1,000,000 USD
Contact Method : With Contact Details
Name : Kelli Clausen , 2888 BRIGHTSIDE DR , BATON ROUGE , LA , 70820-3509 , Ph: 225 757-3216

Posted on :May 26, 2012
Last Updated :May 26, 2012
Bid Date: 14/06/2012

Description:

Special School

Air Handling Unit (AHU) Replacement
Contractor is to provide all materials, labor, equipment, tools, software and 
programming necessary to remove and dispose of existing Air Handling Unit (AHU) #22 
and furnish and install a new Indoor Multi-Zone Air Handling Unit and associated 
controls in its location in the LSVI Academic Building, in strict accordance with the 
following specifications.
Contractor shall furnish all new chilled water and hot water piping, insulation, 
associated drain valves and thermometer wells, hot and chill water valves/control 
valves, and hot and chill water sensor ports from the main shut-off to the new AHU. 
 Contractor is responsible for furnishing and installing any fire and smoke initiating control 
devices that cannot be removed from the existing AHU 22 and reinstalled in the new AHU. 
 Contractor is responsible for furnishing and installing new ductwork necessary for the 
installation of the new AHU
Unit shall be constructed of a complete structural frame with removable panels for access to 
coils.  Removal of side panels shall not affect the structural integrity of the unit. 
 
Panels shall be fully removable to allow for a proper way to thoroughly clean panels of 
microbial growth and to access internal parts.  If panels are not removable, then manufacturer 
shall provide access sections with doors between all internal components to ensure access and cleanability of the air handler. 
All exterior panels and structural frames shall be constructed of galvanized steel.  Casings not 
constructed of galvanized steel, casings with welds on exterior surfaces, or casings with welds 
on interior surfaces that have burned through to exterior surfaces shall be chemically cleaned, 
coated with rust inhibiting primer, and finished with rust inhibiting enamel in order to prevent 
premature corrosion and microbial growth.