UTAH ARCHIVES RECORD CENTER-FIRE SPRINKLER

Location: Clearfield,UT,UNITED STATES
Zip: 84114
Project Type: New Construction
ProjectUse: Governmental Offices
Project Budget: 100,000 to 500,000 USD
Contact Method : With Contact Details
Name : Marla Workman , 4110 STATE OFFICE BUILDING , SALT LAKE CITY , UT , 84114-1208 , Ph: 801 538-3018

Posted on :May 26, 2012
Last Updated :May 26, 2012
Bid Date: 13/06/2012

Description:

Governmental Office[s]

Replacement of the existing fire sprinkler system in Area “A” with an ESFR type system and
the modification of the existing roof level system in Area “B” to meet the new installation
criteria. Hydraulic calculations, supply and installation of the new fire sprinkler system,
modifications to the existing system(s) shall meet the requirements of NFPA 13, the Utah
State Codes, the local Building and Fire Departments and the Owner’s Insurance Company. The
building shall remain in operation during the construction and care shall be taken to protect
the contents of the building and to coordinate the work with the normal activities of the Owner
during the construction period.
The system modifications specified here have been reviewed and tentatively approved by the
Utah State Fire Marshal’s Office. These approvals include a rough layout and hydraulic
calculations of the systems. Completed Shop Drawings and Hydraulic Calculations, including
the coordination of the systems piping with the building structure, mechanical systems, and
electrical systems are still required. The hydraulic calculations utilized for the preliminary Fire
Marshal approval are attached for reference.