NORTH ALDER STREET PARK

Location: Ellensburg,WA,UNITED STATES
Zip: 98926
Project Type: New Construction
ProjectUse: Parks
Project Budget: 100,000 to 500,000 USD
Contact Method : With Contact Details
Name : Brad Case , 501 N ANDERSON ST , ELLENSBURG , WA , 98926-3147 , Ph: 509 962-7204

Posted on :May 11, 2012
Last Updated :May 11, 2012
Bid Date:

Description:

This Phase Of Work Includes TESC, Underground Utilities, Drainage System, Earthwork, Establishing Subgrades For Hardscape Elements Outside Of The Shelter Plaza Area, Installation Of One Prefabricated Restroom Building, Asphalt Parking Lot, Asphalt Pathways, Concrete Pathways, Concrete Steps, Concrete Ramps, Concrete Curbing, Gravel Pathways, Children’s Play Area With Climbing Structure & Swings, Irrigation System, Landscaping, Post And Rail Fencing, And Water/Power/Drainage Stub Ups For Future Water Play Element. The Park Includes Placement Of 316 Tons Of Crushed Rock Base Course, Placement Of 187 Tons Of Asphalt Pavement, Installation Of 595 Lineal Feet Of Concrete Curb Edging, Parking Lot And Court Striping, Concrete Flatwork, Irrigation And Planting 175 Trees And 417 Shrubs, Drill Seeding Of 4 Acres Of Lawn, 925 LF Of Post And Rail Fencing, And Other Miscellaneous Items As Shown On Plans And Described In Specifications.