BIDDEFORD ALFRED STREET COMBINED SEWER PIPE LINING

Location: Biddeford,ME,UNITED STATES
Zip: 4005
Project Type: New Construction
ProjectUse: Water & Sewage Piping
Project Budget: 500,000 to 1,000,000 USD
Contact Method : With Contact Details
Name : Brian Phinney , 205 MAIN ST , BIDDEFORD , ME , 04005-2414 , Ph: 207 284-9307

Posted on :May 11, 2012
Last Updated :May 11, 2012
Bid Date: 29/05/2012

Description:

Water Piping,Sewage Piping

Alfred Street Cured-In-Place-Pipe (CIPP) Lining Project

Supplying and installing materials and equipment to line approximately 630 linear feet of 24” Brick & VC Combined Sewer along a portion of Alfred Street.

GENERAL OUTLINE OF WORK
The outline of work presented below is intended to be only a general outline of elements of work required under this project. The pipe supplier is responsible for all items of work, whether specifically listed or not, required to satisfactorily complete the installation work according to the project drawings and specifications, according to all state and local codes and to make a complete and operable system. The major elements of work are presented below.

WORK TO BE PERFORMED BY BIDDER:

1. Meet with City to discuss project prior to start of construction.
2. Provide and Install Cured-In-Place-Pipe (CIPP) Liner
3. Internally core existing services and pipes
4. Other operations as required to complete project.