TACTICAL UNMANNED AERIAL VEHICLE HANGAR SINGLE SB

Location: Aurora,CO,UNITED STATES
Zip: 80013
Project Type: New Construction
ProjectUse: Military - Misc.
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : Jesse Searles , 660 S ASPEN ST MAIL STOP 66, BUCKLEY ANG BASE BLDG 1005 , AURORA , CO , 80011-9551 , Ph: 720 847-8391

Posted on :July 31, 2012
Last Updated :July 31, 2012
Bid Date: 28/08/2012

Description:

Military – Miscellaneous

Synopsis for Single SB Set-Aside with Options to Construct a New Tactical Unmanned Aerial Vehicle Hangar The Tactical Unmanned Aerial Vehicle Hangar entails the construction of a new 10,394 square foot hangar/administration facility and site. This facility will be located south of the existing Building 1500. The components of the Project include the following items as well as other trades as documented in the Contract documents. Selective demolition of small buildings and site, sitework, utilities and new construction including potable water, fire line, sanitary sewer, electrical, natural gas, communications, concrete curb and gutter, asphalt paving, earthwork, foundations, concrete floor slabs, masonry, pre-engineered metal building, standing seam metal roofing, metal stud non-load bearing walls, laminated glazing window and door systems, overhead coiling metal doors, hollow metal doors, carpet, stained concrete floor system, porcelain tile, resilient base, gypsum drywall walls and ceilings, painting, lay-in acoustical tile ceilings, mechanical HCAV equipment, ductwork and diffusers, fire suppression system, restroom fixtures and appurtenances, power cabling and conduit, lighting, fire detection/alarm system, intercom/mass notification system, audio/visual equipment, and other miscellaneous construction. It is the goal of this project to construct a “green” building that meets the US Green Building Council’s LEED Green Building Rating System Version 2009 of Silver.

The project includes optional line items (OLI’s). These items do not require rework of base contract work or modifications to other OLI items. OLI-1: Photovoltaic System. This item consists of a new photovoltaic system located on the roof of the building as indicated on the Drawings. OLI-2: Exhaust Fans, EF-3, EF-4 and EF-5. This item consists of a new fan units located in the Garage Area as indicated on the Drawings. This item consists of all necessary structural supports, electrical supply and controls for the units. OLI-3: Floor Logo and Plaque. This item consists of a new floor logo and plaque located in the Lobby Area as indicated on the Architectural Drawings. OLI-4: Polished Concrete in the Lockers. This item consists of a new polished concrete flooring type located in the Locker Area as indicated on the Architectural Drawings. OLI-5: Classroom Acoustical Partition. This item consists of a new classroom acoustical partition located in the Classroom Area as indicated on the Drawings. This item consists of the partition, all structural steel supports and bracing, ceiling and wall modifications to incorporate the partition unit. OLI-6: Concrete Apron Area. This item consists of placing a new concrete paving in front of the overhead doors in lieu of the base bid item of asphalt paving as indicated on the Drawings.