UKIAH GOBBI STREET & STATE STREET & UTILITIES

Location: Ukiah,CA,UNITED STATES
Zip: 95482
Project Type: New Construction
ProjectUse: Water & Sewage Piping
Project Budget: 500,000 to 1,000,000 USD
Contact Method : With Contact Details
Name : Richard Seanor , 300 SEMINARY AVE , UKIAH , CA , 95482-5400 , Ph: 707 463-6200

Posted on :July 31, 2012
Last Updated :July 31, 2012
Bid Date: 14/08/2012

Description:

Road[s],Sidewalk[s], Curb[s], Gutter[s],Water Piping,Electrical Work,Pavement Markers,Sewage Piping

Intersection of Gobbi and State Streets and E. Gobbi Street between State and S. Main Streets and involves the construction of new 6”, 8” and 12” water mains and associated appurtenances, the abandonment of existing water mains,the construction of new 18” RCP storm drain, 60” storm drain manhole, the removal and replacement of a catch basin, the construction of new 12” PVC sewer main, 60” sewer manhole, the abandonment and removal of existing sewer system, and the replacement of the curb return at the southeast corner of State Street and Gobbi Street. The new curb return includes miscellaneous curb, gutter and sidewalk and a new wheelchair ramp. A new traffic signal pole and signal will be constructed at the new curb return, with miscellaneous conduit, pull boxes, and detectors. In addition, the limits of E. Gobbi Street from State to S.Main Streets will have a grind and AC overlay. Existing traffic signal, power and telephone lines in the vicinity of the work shall be protected from injury by Contractor during construction and until completion of the work. Contractor shall be liable for all damages to such facilities. There are a number of existing underground utilities located within the project limits