MCHENRY COUNTY MAIN STREET CULVERT

Location: ,IL,UNITED STATES
Project Type: New Construction
ProjectUse: Excavating & Grading
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : Joseph Korpalski Jr. , 16111 NELSON RD , WOODSTOCK , IL , 60098-9533 , Ph: 815 334-4960

Posted on :July 31, 2012
Last Updated :July 31, 2012
Bid Date: 14/08/2012

Description:

Bridge[s] & Culvert[s],Park[s], Landscaping,Road[s],Sidewalk[s], Curb[s], Gutter[s],Water Piping,Excavating & Grading,Flood Control,Sewage Piping

Main Street Culvert Replacement installation of storm sewer system and culvert replacement under Main Street from Richardson Road to East Street. The project requires earth excavation, storm sewer removal (8 , 24 and 30 ) and installation (12 , 24 and 30 ), drainage structures installation, culvert removal and replacement, installation of headwall, dewatering, streambank stabilization, articulated block revetment mat installation, reconstruction of shoulders and sidewalks, pavement replacement, seeding and sodding of disturbed areas and other appurtenances necessary to complete the project. Quantities include: 50 cu. yd. of earth excavation; 407 sq. yd. of topsoil furnish and place; 765 ft. of storm sewer, class A, type 2; 5 each of manhole, type A; 4 each of catch basin, type A; 5 each of catch basin, type C; 78 unit of tree removal; 380 cu. yd. of structure excavation; 50 cu. yd. of concrete structures; 1 lump sum of dewatering; 41 sq. yd. of articulated block revetment mat; 5172 sq. ft. of portland cement concrete sidewalk, 5 ; 540 ton of hot-mix asphalt surface and binder courses and other appurtenances necessary to complete the project