GLENDALE COMMUNITY CENTER PEDESTRIAN & BIKE PATH

Location: Glendale,WI,UNITED STATES
Zip: 53209
Project Type: New Construction
ProjectUse: Sidewalks
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : , 5909 N MILWAUKEE RIVER PKWY , GLENDALE , WI , 53209-3815 , Ph: 414 228-1718

Posted on :July 31, 2012
Last Updated :July 31, 2012
Bid Date: 16/08/2012

Description:

Bridge[s] & Culvert[s],Road[s],Sidewalk[s], Curb[s], Gutter[s],Water Piping,Excavating & Grading,Fencing,Pavement Markers,Flood Control,Sewage Piping

Paving approximately one half mile of bike trail and access road to substation, striping, signage, grading fill, topsoil, seeding, 12-inch culverts and end walls, bollards, removal and replacement of existing swing gate and installation of two new swing gates. Major items of work include: 20 sq. yds. clearing; 20 sq. yds. grubbing; 1 each removing small pipe culvert; 29 sq. yds. removing asphaltic surface; 12 lin. ft. removing curb & gutter; 14 lin. ft. removing fence; 1 lump sum, removing boulders; 1 each removing swing gate; 2 each swing gate; 1,315 cu. yds. excavation, common; 1 each finishing roadway; 840 ton base aggregate dense 3/4-inch; 2,985 ton base aggregate dense 1-1/4-inch; 41 ton asphaltic material PG 58-34; 73 gallons tack coat; 690 ton HMA pavement Type E-1; 61 lin. ft. culvert pipe corrugated aluminum 12-inch; 4 each apron end walls for culvert pipe aluminum 12-inch; 13 lin. ft. concrete curb & gutter 30-inch Type L; 6 cu. yds. riprap medium; 1 lump sum mobilization; 6 MGAL, water; 2,216 sq. yds. topsoil; 5,330 lin. ft. silt fence; 5,330 lin. ft. silt fence maintenance; 2,216 sq. yds. erosion mat class II Type B; 3 each inlet protection Type A; 1 CWT, fertilizer Type B; 80 lb. seeding mixture No. 20; 8 each posts, tubular steel 2 x 2 inch by 14-ft.; 30 sq. ft. signs, reflective Type II; 1 each traffic control; 655 lin. ft. pavement marking epoxy 4-inch; 13 lin. ft. pavement marking stop line epoxy 12-inch; 1 each pavement marking arrows bike lane; 2 each pavement marking symbols bike lane; 1 each pavement marking words; 1 lump sum survey project; 105 lin. ft. sawing asphalt; 155 sq. ft. retaining wall concrete modular block; 2 each tacking pads; 46 sq. ft. detectable warning field yellow; 4 each bollards; 11 sq. yds. concrete pavement 8-inch; 980 lin. ft. fence chain link 6-ft.; 3 adjust manhole; 2 each culvert pipe checks