SHARON COMMUNITY CENTER ELECTRICAL ROOM-ELECTRICAL

Location: Sharon,MA,UNITED STATES
Zip: 02067-2714
Project Type: New Construction
ProjectUse: Government - Misc. Bldgs.
Project Budget: 10,000 to 50,000 USD
Contact Method : With Contact Details
Name : James Wright , 90 S MAIN ST , SHARON , MA , 02067-1954 , Ph: 781 784-1515

Posted on :July 28, 2012
Last Updated :July 28, 2012
Bid Date: 08/08/2012

Description:

Government – Miscellaneous Building

400 Amp Generator Rollup Connection/Transfer Switch. At the Sharon Community Center Council on Aging Area: -Furnish and install new 400 amp MTS in main electrical room. -Furnish and install conduit and feeder from main distribution panel board to MTS(Utilizing existing 400sub breaker). -Furnish and install conduit and feeder to existing 400 amp main lug panel board. -Furnish and install conduit and wiring from MTS to front to generator connection box.(10’ allowance). -Furnish and install nema 3r terminal connection box for generator. -Furnish and install 4” schedule 80 PVC sleeve with caps in out side wall. -Furnish and install 4” schedule 80 PVC sleeve with caps in electrical room wall. -Furnish and install coring as needed for sleeves , (2) 5” cores. -Mud in sleeves as needed. -All work to be done during normal business hours.