CLIFTON MILLS WATER SYSTEM CONTRACT 2

Location: Clifton Mills,WV,UNITED STATES
Zip: 26525
Project Type: New Construction
ProjectUse: Water & Sewage Treatment
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : Robert Bailey , PO BOX 370 , BRUCETON HILLS , WV , , Ph:

Posted on :July 28, 2012
Last Updated :July 28, 2012
Bid Date: 28/08/2012

Description:

Water Treatment,Water Piping

Contract #2 – Water Treatment Plant Improvements: Construction time limit is (270) calendar days with liquidated damages of one thousand dollars ($1,000.00) per day. Contract #2 consists of the construction of the following: Water plant upgrade including a 350 GPM filter addit ion, clearwell tank, overhead crane, computer software upgrade and associated piping, electrical, plumbing, plant e mergency generator and controls. Upgrade five (5) existing well pumps and controls. Water system improvements to include the installation of approximately 7,800 LF of raw water lines with new 8″ and 4″ PVC and 10″ and 5″ HDPE water lines, with all valves, fittings, steel casing, new water meter assembly, and all other necessary appurtenances required to complete water line improvements complete. Install 400 LF of chain link fence with gates and locking equipment at an existing tank site