MT BAKER SNOQUALMIE NATIONAL FOREST ANDERSON CREEK BRIDGE

Location: Sedro Woolley,WA,UNITED STATES
Zip: 98284-1263
Project Type: New Construction
ProjectUse: Bridges & Culverts
Project Budget: 100,000 to 500,000 USD
Contact Method : With Contact Details
Name : Jorge A Somoza , 2930 WETMORE AVE STE 3A , EVERETT , WA , 98201 , Ph: 425 783-6052

Posted on :July 26, 2012
Last Updated :July 26, 2012
Bid Date: 16/08/2012

Description:

Bridge[s] & Culvert[s]

Rreplacement of a 60′ long log stringer bridge at Mile Post 5.3 of Forest Road 1107. Bridge work includes installing a 70′ long, Government-furnished prefabricated bridge (including concrete sills, backwalls/retaining walls, decking surface, & object markers). Work includes erosion control and resource protection, clearing and grubbing, removal of existing log stringer bridge, riprap, bridge installation, approach work, excavation and embankment, crushed rock surfacing, hauling of waste material, seeding and mulching. This project is located on the Mt. Baker Ranger District, of the Mt. Baker-Snoqualmie National Forest. From Sedro-Woolley, WA head east about 17 miles to the Baker Lake Highway, then go 13 miles to Road 1106, 2 miles to the Upper Baker Dam, across the dam, and up Road 1107 5.3 miles to the project site.