HOPEWELL TOWNSHIP RACCOON CREEK WATER POLLUTION CONTROL

Location: Aliquippa,PA,UNITED STATES
Zip: 15001
Project Type: New Construction
ProjectUse: Water & Sewage Treatment
Project Budget: 100,000 to 500,000 USD
Contact Method : With Contact Details
Name : Norm Kraus Jr , 1700 CLARK BOULEVARD , ALIQUIPPA , PA , 15001-4205 , Ph: 724 378-1460

Posted on :July 26, 2012
Last Updated :July 26, 2012
Bid Date: 09/08/2012

Description:

Water Treatment

Work Shall Consist Of The removal And Disposal Of The Existing Centrifugal Blowers And Controls And Certain Air Piping From The Existing Blower Control Building And Replacement With New Positive Displacement Blowers, Filter Silencers, Blower Control Panel, Piping, Valves, Fittings, Etc. Work Shall Include All Demolition, Removal, And Disposal Of Aeration Equipment, Piping, Sparge Plates, Baffles, Mixers, Motors, Etc, From Our Four (4) existing Aeration Basins, Proposed Work Shall Includes the Installation Of A New Fine Bubble Diffused Aeration System And Associated Piping, Fittings, Valves, And Appurtenances. Work Shall Also Include The Demolition, Removal, And Disposal Of The Existing Sludge Holding Tank Aeration System Including Piping And Diffusers, And Replacement With A New Fine Bubble Diffused Aeration System And Associated Piping, Fittings, Valves, And Appurtenances, New Positive Displacement Blowers, Blower Control Panel, Etc. This Work Will Include The Construction Of A Small Blower Control Building Enclosure (Masonry Construction). All Work Shall Include General And Electrical Construction, Start-up And Training, And Shall Be Complete In Place In Accordance With The Plans And Specifications.