PADOT SR 307 BRIDGE

Location: Tunkhannock,PA,UNITED STATES
Zip: 18657
Project Type: New Construction
ProjectUse: Pavement Markers
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : , 400 NORTH ST FL 7 , HARRISBURG , PA , 17120-0200 , Ph: 717 346-9554

Posted on :July 25, 2012
Last Updated :July 25, 2012
Bid Date: 23/08/2012

Description:

Bridge[s] & Culvert[s],Road[s],Water Piping,Excavating & Grading,Pavement Markers,Sewage Piping

Improvement of a certain section of STATE HIGHWAY in WYOMING COUNTY, TUNKHANNOCK TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0307, SECTIONS 770 & 771. The project being situated as follows: From a point approximately .152 mile NORTHWEST of the intersection with SR 2035 at Segment 0150, Offset 0676 (Station 102+75.00) along SR 0307 (Roosevelt Highway) to a point approximately .084 mile SOUTHEAST of the intersection with SR 0092 at Segment 0150, Offset 1976 (Station 115+75.00) along SR 0307 (Roosevelt Highway). The project consists of the replacement of Two (2) existing one span concrete T-beam bridges with Two (2) proposed one span Composite P/S Concrete Spread Box Beam bridges. Other roadway approach work includes guiderail, full depth bituminous pavement, excavation, drainage, temporary concrete barrier, landscaping, erosion & sediment control measures, temporary traffic control, temporary traffic signals, pavement markings, signing, bridge removal, temporary excavation & support, sanitary sewer relocation and other miscellaneous construction all contained within an overall project length of 0.227 mile (1200 linear feet) as indicated on the approved drawings included in the bid package.