SHOW LOW 43RD AVENUE & EAST MCNEIL ROADS

Location: Show Low,AZ,UNITED STATES
Zip: 85901
Project Type: New Construction
ProjectUse: Flood Control
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : , 180 N 9TH ST , SHOW LOW , AZ , 85901-5116 , Ph: 928 532-4081

Posted on :July 17, 2012
Last Updated :July 17, 2012
Bid Date: 31/07/2012

Description:

Road[s],Water Piping,Excavating & Grading,Flood Control,Sewage Piping

43rd Avenue and East McNeil Reconstruction : Reconstruction of approximately 5,800 LF of existing roadway, known as 43rd Avenue from Clark Road (SR 260) to the Eagle Mountain Subdivision and approximately 2000 LF of existing roadway known as East McNeil from N. 5th street to S. Central Ave. in Show Low, Arizona. Work includes, but not necessarily limited to, the milling of existing asphalt roadway, recycle of existing asphalt for roadway base, reshaping and sub-grade preparation, lowering the roadway grade on a 400-foot section of 43rd Ave. and other items necessary for the accomplishment of the improvement. The work also includes, but is not limited to, utility coordination, traffic control, and erosion control. The work includes all required labor, material, transportation and services for the project to complete a usable and operable facility in accordance with all pertinent codes and regulations as necessary to complete the job in a workmanlike manner as shown on the Construction and Bid Documents. The Contractor shall furnish all labor, equipment, materials and incidentals as may be required to accomplish the project(s) outlined in the Bid Form.