RIVERSIDE COUNTY INTERSTATE 215 WIDENING

Location: ,CA,UNITED STATES
Project Type: New Construction
ProjectUse: Pavement Markers
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : , 4080 LEMON ST FL 3 , RIVERSIDE , CA , 92501-3634 , Ph: 951 787-7141

Posted on :June 22, 2012
Last Updated :June 22, 2012
Bid Date: 14/08/2012

Description:

Road[s],Pavement Markers

Widening of Interstate 215 (I-215) from two to three lanes in both the northbound and southbound directions by adding a third mixed-flow lane. The third lane is to be added within the median from Scott Road to a point approximately one-mile north of the State Route (SR) 74 East undercrossing, as well as along the outside of the existing I-215 paved lanes up to Nuevo Road. The Project also includes overlaying the remainder of the existing paved facility with hot mix asphalt (HMA). Where the outside widening is to occur, the existing median structural section and barrier are to be improved or replaced as required. The total length of the Project is approximately 14.3 miles, including transition striping areas and the limits for the installation of construction signage