STILLWATER KAW LAKE RAW WATER & FINISHED WATER LINES

Location: Stillwater,OK,UNITED STATES
Zip: 74074
Project Type: New Construction
ProjectUse: Sidewalks
Project Budget: 100,000 to 500,000 USD
Contact Method : With Contact Details
Name : , 723 S LEWIS ST , STILLWATER , OK , 74074-4652 , Ph: 405 742-8351

Posted on :June 20, 2012
Last Updated :June 20, 2012
Bid Date: 09/07/2012

Description:

Sidewalk[s], Curb[s], Gutter[s],Water Piping,Excavating & Grading

Task 1 – 36-inch Raw Water Line between Kaw Lake Raw Water Pump Station and
the City of Stillwater Water Treatment Facility
* Excavation/Site improvements at approximately FOUR (4) locations labeled as
(TAP) along the existing Kaw Water Line alignment to install by others a 6-inch
water tap (Hanson Pipe Co.) required for water line condition assessment. Other
improvements required at each excavation site are described in more detail
throughout the Project Manual.
* Excavation/Site improvements at approximately SEVENTEEN (17) locations labeled
as (SBR) along the existing Kaw Water Line alignment to allow for installation by
others of SBR sensor required for water line condition assessment. Other
improvements required at each excavation/improvement site are described in more
detail throughout the Project Manual.

” Removal of silt/Dewatering/Pipe surface preparation at approximately TWELVE (12)
existing Air Relief Valve – Manway vaults/pits labeled as (ARV-MW & Air Valve)
along the existing Kaw Lake Raw Water Line alignment to allow for installation by
others of SBR sensor required for water line condition assessment. Other
improvements required at each air relieve valve- manway vault/pit include, clearing
and grub, guard railing coating and repairs, furnishing and installation of pipe line
warning signs, etc.
* Removal of silt/Dewatering, Clearing/Grub, guard railing coating and repair and
furnish and install pipe line warning sign at approximately TWO (2) existing Air
Relief Valve-Manway (ARV-MV) vaults/pits along the existing Kaw Lake Raw Water
Line alignment.
* Clearing/Grub, guard railing coating and repair, furnish and install pipe line warning
signs at approximately TWELVE (12) existing Blow Off (BO) structures along the
Kaw Lake Raw Water Line alignment.

Task 2 – 36-inch Finished Water Line between City of Stillwater and Oklahoma State University Water Treatment Facilities

* Excavation/Site improvements at approximately TWO (2) locations labeled as (TAP)
along the existing Finished Water Line alignment to install by others a 6-inch water
tap (Hanson Pipe Co.) required for water line condition assessment. Other
improvements required at each excavation site are described in more detail
throughout the Project Manual.
* Excavation/Site improvements at approximately TWO (2) locations labeled as (SBR)
along the existing Finished Water Line alignment to allow for installation by others of
SBR sensor required for water line condition assessment. Other improvements
required at each excavation/improvement site are described in more detail
throughout the Project Manual.
* Removal of silt/Dewatering/Pipe surface preparation at approximately TWO (2)
existing Air Relief Valve – Manway vaults/pits labeled as (ARV-MW & Air Valve)
along the existing Finished Water Line alignment to allow for installation by others of
SBR sensor required for water line condition assessment. Other improvements
required at each air relief valve- manway vault/pit include, clearing and grub, guard
railing coating and repair, furnishing and installation of pipe line warning signs, etc.
* Removal of silt/Dewatering, Clearing/Grub, guard railing coating and repair, furnish
and install pipe line warning sign at approximately THREE (3) existing Air Relieve
Valve-manway (ARV-MV) vaults/pits along the existing Finished Water Line
alignment.
Clearing/Grub, guard railing coating and repair, furnish and install pipe line warning
signs at approximately FIVE (5) existing Blow Off (BO) structures along the Finished
Water Line alignment.