ELROY POWERHOUSE FLOOD MITIGATION

Location: Elroy,WI,UNITED STATES
Zip: 53929
Project Type: New Construction
ProjectUse: Water & Sewage Piping
Project Budget: 1,000,000 to 10,000,000 USD
Contact Method : With Contact Details
Name : , 225 MAIN ST , ELROY , WI , 53929-1251 , Ph: 608 462-2400

Posted on :June 20, 2012
Last Updated :June 20, 2012
Bid Date: 05/07/2012

Description:

Road[s],Sidewalk[s], Curb[s], Gutter[s],Water Treatment,Water Piping,Flood Control,Sewage Piping,Sewage Treatment

Powerhouse Flood Mitigation – to include: construction of a Flood Levee and Wall consisting of 290 LF of steel sheet piling, 280 LF of free-standing cast-in-place concrete wall with formliner, and 93 LF cast-in-place concrete building wall enclosure with formliner. Other components include cast-in-place concrete pump pit, stormwater check-valves, portable flood pump, portable flood shields, storm sewer and structures, chain-link fencing and gates, steel guard rails, miscellaneous architectural trim, concrete sidewalk, asphalt paving, and, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents